Contractor: Head Office Interiors
Completion Date: May 2015
Mechanical & Electrical Value: £500k Phase 2 (£2.8 million)
Following a competitive tender process Acumen Projects were awarded the Mechanical & Electrical Services packages on 21 Apartments and 4 Luxury Penthouses by Head Office 3 (Leeds). The site is located in central Nottingham. Acumen completed Phase I of the project which consisted of 340 apartments in 2006.
The completed project consists of a twelve storey building containing 340 apartment over 9 floors as part of the phase I works. The phase II works consisted of 21 apartments and 4 luxury penthouses on the 10th, 11th and 12th floors.
Scope of Works (Mechanical & Plumbing)
- Design & Production of Drawings
- Hot Water Services
- Boosted Cold Water Services
- Above Ground Drainage
- Underfloor Heating
- Dry Riser
- Air Conditioning
- Sanitaryware
- Extract Ventilation
- Smoke Ventilation
- Insulation
- Commissioning and Testing
- Operation & Maintenance Manual’s
Scope of Works (Electrical services)
- Design & Production of Drawings
- Mains Supply
- Switchgear Distribution Boards and Mains
- General Power Installation
- PV Array Supply and Installation.
- Lighting Installation – Internal and External
- Smoke Alarm
- Fire Alarm
- Telephone
- Access Control
- CCTV
- Electric Heating
- Mechanical Services Controls Wiring
- TV/Satellite
- Earthing and Bonding
- Data Installation
- Intercom System
- Testing
- Operation & Maintenance Manual’s